Danil54grl
Top Poster
Intro
introductions are always funWe got the sub floor on the house done today. Got the French drain put in around the foundation and backfilled. The water and electric will be put in tomorrow.
Since the house is being built on a slope we ended up with a 5-1/2 foot "crawl" space under the house. Once the final inspection is done I'll go under and dig down another foot and make a root cellar that will cover about 1/2 of the house. This will save us the expense of excavating and building a root cellar outside.
The new bull was delivered today and was introduced to the girls.